[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: cleaner wiring solution needed



Welp that's what I'm talking about. I used to do that with Radx =
636's...but I'm thinking; is it right? What if some schmuck cant install =
an FBI XL2 on it later? - should I care? What if all I EVER know was to =
run openings to keypads or openings to j-boxes?

I kinda enjoy screwing over the low-ballers but....

I'm wondering how RHC would think on this too, considering his opinion =
about locking panels...and ethics...etc.

I shoulda started a new ethics thread=20

:-)


"Jackcsg" <nospam@xxxxxxxxxx> wrote in message =
news:V6idnYUvPbosAN_fRVn-2g@xxxxxxxxxxxxxxx
> Crash....start wiring a few zones back to some keypad locations. =
There's
> always the 790 keypad. It should even cut down on the amount of wire =
you
> have to pull back to the can.
> ;-)
>=20
> "Crash Gordon=AE" <NONE@xxxxxxxx> wrote in message
> news:PFp0e.62$pA4.618@xxxxxxxxxxxxxxxxxx
> I don't give it away to the builder...its just that with a custom spec =
the
> builder never know when hes gonna sell it and to whom, sure we get a =
good
> portion of the trims, but then some jerk puts in his own Skylink or =
some joe
> schmoe comes along and puts in a 4 zone panel in a house that needs 20
> zones...etc.
>=20
>=20
> "alarman" <alarman2000@xxxxxxxxx> wrote in message
> news:UVo0e.608$Mt5.355@xxxxxxxxxxxxx
> > Crash Gordon=AE wrote:
> > > kinda why I'm asking for opinions...these days all the houses I've
> > > been doing are 5000 sq+ and the wire cost and labor is killing
> > > me...to stay at a reasonable price to the builder (or custom =
builder)
> > > it would be much more cost effective to use addressable stuff and
> > > prewire for that.
> > >
> > > some of the customs are 'spec' houses, so we don't get contact =
with
> > > the h/o until the drywall is up...or later.
> > >
> > > i'm bidding a 5400 sq ft one right now, the freekin ceilings are =
16'
> >
> > I stopped giving it away on those monsters. I figure my real costs =
and
> labor
> > at $75/hr plus. If the builder wants it cheaper, he can get out the =
yellow
> > pages. Nobody is building their million dollar house on my back, not
> > anymore. I found a select few builders who are willing to pay. No =
short
> > cuts. I take my time and make the wiring neat. I use drive rings. I =
drill
> my
> > own goddamned holes, and use the right wire for each application, =
not 22/4
> > for everything. Lots of extra wiring for future possibles. No banjo
> strings
> > in the attic. No ragged holes in their door jambs.
> > js
> >
> >
> >
>=20
>