The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Ultimate Node0 design ?



Patience ;-)

James Hoye wrote:
>
> Lehane Kellett wrote:
> > Presumably Node0, Node1, Node2, etc. Each a functional area.
> >
> > This is the approach I took - there is a Node 0 where all the
Cat5 is
> > terminated and the HA server but Node 1 has most of the home run
> > lighting (75 cables!) and the dimmer packs/transformers (20
channels),
> > Node 2 is the boiler room with a xAP Netiom and an industrial
PLC, Node
> > 3 has 2 Netioms (for individual heating control and misc
switching -
> > lights, fans, mirrors, UFH, etc) and a dimmer pack. Excluding the
> > dimmers, the control gear is in industrial steel enclosures in
void
> spaces.
>
> Surely I can't be the only one thinking "pictures"... :)
>
> James
>
>
>
------------------------------------------------------------------------
>
> No virus found in this incoming message.
> Checked by AVG Free Edition.
> Version: 7.1.394 / Virus Database: 268.10.3/395 - Release Date:
21/07/2006
>



[Non-text portions of this message have been removed]




UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.