The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Ultimate Node0 design ?



Lehane Kellett wrote:
> Presumably Node0, Node1, Node2, etc. Each a functional area.
>
> This is the approach I took - there is a Node 0 where all the Cat5 is
> terminated and the HA server but Node 1 has most of the home run
> lighting (75 cables!) and the dimmer packs/transformers (20 channels),
> Node 2 is the boiler room with a xAP Netiom and an industrial PLC,
Node
> 3 has 2 Netioms (for individual heating control and misc switching -
> lights, fans, mirrors, UFH, etc) and a dimmer pack. Excluding the
> dimmers, the control gear is in industrial steel enclosures in void
spaces.

Surely I can't be the only one thinking "pictures"...  :)

James



UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.