[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Keeping up with Cables in new installation



Try One of these: about 100 bucks:
> http://global.dymo.com/enUS/Products/RhinoPRO_3000.html





Crash Gordon wrote:
> Wire # tags and a wirelist.
>
>
> <bhnjr@xxxxxxxxx> wrote in message
> news:1131485346.525646.182500@xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
> |I have a number of commercial jobs coming up. They are all new
> | construction.  It looks like most of the jobs will have about 15
> | detectors, several keypads, several sirens,  7-8 access control units,
> | and 7-8 electric locks, and a digital video recording system (10-12
> | cameras)..  There will also be magnetic locks on several outside doors,
> | that will be locally monitored.  In all, there will be somewhere around
> | 60 cable runs.  Now I know that there are many ways that an installer
> | can keep up with his cable runs, but I would just like to know how you
> | would keep up with your cable runs on a simular installation, when
> | working alone.  One other ingrediant; there will be about 3 months
> | between running the cables and final installation.  My mind does not
> | remember things too well these days.  Thank you.
> |
>
>


alt.security.alarms Main Index | alt.security.alarms Thread Index | alt.security.alarms Home | Archives Home