[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Keeping up with Cables in new installation



Wire # tags and a wirelist.


<bhnjr@xxxxxxxxx> wrote in message
news:1131485346.525646.182500@xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
|I have a number of commercial jobs coming up. They are all new
| construction.  It looks like most of the jobs will have about 15
| detectors, several keypads, several sirens,  7-8 access control units,
| and 7-8 electric locks, and a digital video recording system (10-12
| cameras)..  There will also be magnetic locks on several outside doors,
| that will be locally monitored.  In all, there will be somewhere around
| 60 cable runs.  Now I know that there are many ways that an installer
| can keep up with his cable runs, but I would just like to know how you
| would keep up with your cable runs on a simular installation, when
| working alone.  One other ingrediant; there will be about 3 months
| between running the cables and final installation.  My mind does not
| remember things too well these days.  Thank you.
|




alt.security.alarms Main Index | alt.security.alarms Thread Index | alt.security.alarms Home | Archives Home