The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: UPS Recommendation



Hi Paul,
I did reply  yesterday.  Did you get my email?
Perhaps check your spam folder?
Rgds
Andy

--- In ukha_d@xxxxxxx, "Paul" <paul@...> wrote:
>
> Hi Andy,
>
> I sent you an email with regard to the thread you started yesterday
about a UPS "sale".
>
> My main machine will be the new server with a Via Nano 1GHz CPU on a
mini-itx board, 2 x 2.5" laptop HDD and 2 x 3.5" WDD Cavier
Green. As this is not currently built I'm not sure how much power it will
use I'm guessing 50W but certainly not more than 100W. This machine is
running HA so should stay up as long as possible (although it now has no
spare PCI slots for plugin card).
>
> My other server is a Quad core with 5 x HDD this consumes around 150W,
but doesn't do anything essential so should shutdown gracefully as soon as
mains power is lost.
>
> I know that doesn't answer your question specifically but can you
advise based on experience and my brief outline?
>
> Paul
>
> --- In ukha_d@xxxxxxx, "Andy" <andywhitfield2002@>
wrote:
> >
> > Hi Paul,
> >
> > Do you know what VA rating you require?
> > Or how much power in watts your servers draw?
> >
> > And how much runtime you need?
> >
> > 400mm isn't very deep.  Typically the smaller rackmount UPSs are
460mm / 18 inches deep.  Plus you need room to plug in the cables at the
back.
> > I have rackmount and tower UPSs available.
> >
> > Regards
> > Andy the UPS Man.
> >
> > --- In ukha_d@xxxxxxx, "Paul" <paul@> wrote:
> > >
> > > Well after three and a half years service my Mini-ITX based
HA server is no more. Had a couple of power cuts yesterday afternoon and
she did not recover, no beeps, no monitor output and resetting CMOS had no
effect.
> > >
> > > So can anyone recommend a relatively cheap UPS preferably
rackmounted (although if they go above 400mm deep that won't be an option).
Would need to control power down on two servers.
> > >
> > > MT
> > >
> > > Paul
> > >
> >
>




------------------------------------


UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.