[Message Prev][Message
Next][Thread Prev][Thread Next][Message
Index][Thread Index]
Fw: CAT5 embedded in screed - ok ?
- Subject: Fw: CAT5 embedded in screed - ok ?
- From: Gareth Cook <g@xxxxxxxxxx>
- Date: Sun, 5 Nov 2006 17:13:57 +0000
I started all this In january - all planed up to a finish in july.
Had some guys into lay the floor and level the floor (their suggestion)
they cocked it up - dont want to know.
So now Im having to clear the whole of the downstairs again (with a
newborn baby - this should have been done before she was born) - and they
will kango up the floor.
Im then going to get in a company to stick a hose in the door and pour in
a 30mm screed from a mixer truck. Not by hand.
Whilst im at it i could bung some cables in - but anything that has
"air"
in it im thinking is a bad idea ! if not, i just wont do it.
G.
Gareth Cook
IT Architect / Project Manager, SWG Sales
IBM SWG Sales - Lotus Park, Staines, TW18 3AG
Office: +44 (0)1784 445166 - Mobile: +44 (0)7980 445166
email: g@xxxxxxx
----- Forwarded by Gareth Cook/UK/IBM on 05/11/2006 16:54 -----
Discussion
Main Topic
ukha_d@xxxxxxx
Today 14:23
.
Subject:
.
Re: Fw: [ukha_d] CAT5 embedded in screed - ok ?
.
Category:
Gareth
What's the floor finish?
I can see your problem because a 20mm conduit will only leave 8 - 10mm
of screed over the top of it. However, if the floor finish is suitable,
it probably wouldn't matter too much.
What about going over the top and boxing the cables in a "riser"
somewhere?
Regards
Neil
Gareth Cook wrote:
>
> I'd like to get as much of the screed down as poss, and not have
conduit
> with "air pockets" essentially
>
> The base underneath is the normal concrete floor - this is a 30mm
screed
> on top.
>
> G.
>
> Gareth Cook
> IT Architect / Project Manager, SWG Sales
> IBM SWG Sales - Lotus Park, Staines, TW18 3AG
> Office: +44 (0)1784 445166 - Mobile: +44 (0)7980 445166
> email: g@xxxxxxx <mailto:g%40uk.ibm.com>
>
> ----- Forwarded by Gareth Cook/UK/IBM on 05/11/2006 09:04 -----
>
> Discussion
> Main Topic
>
> ukha_d@xxxxxxx <mailto:ukha_d%40yahoogroups.com>
> Yesterday 22:54
>
> .
> Subject:
> .
> Re: [ukha_d] CAT5 embedded in screed - ok ?
> .
> Category:
>
> Yes Gareth
>
> Any movement in the floor at all (at slab joints etc) would break the
> conductors.
>
> Why not run them in a length of PVC conduit? - or are we talking about
> 10's of runs?
>
> Besides, it not good practice - I'd hate to do a job thinking that
when
> somebody looks at it a few years later, they start muttering about
> cowboys etc!!!
>
> Cheers
>
> Neil
>
> Gareth Cook wrote:
> >
> > If I were to lay out a bunch of cat5 cable on a concrete floor,
then
had
> > 30mm of screed laid down embedding the cat5 - anything wrong with
that
> ??
> >
>
> ** Sponsored by http://www.BERBLE.com <http://www.BERBLE.com>
**
> all the Cool Stuff, in one Place
>
> [Non-text portions of this message have been removed]
>
>
** Sponsored by http://www.BERBLE.com **
all the Cool Stuff, in one Place
[Non-text portions of this message have been removed]
** Sponsored by http://www.BERBLE.com **
all the Cool Stuff, in one Place
UKHA_D Main Index |
UKHA_D Thread Index |
UKHA_D Home |
Archives Home
|