The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Re: Solar PV ?



Well, I've just sent off the deposit and contract for my own solar PV
installation.  Lead time is six to eight weeks for the installer I've
chosen, but he was by far the most professional and confidence-
inspiring of those I saw.

I'm having 14 x 260W panels installed which is slightly lower than I'd
have liked or have space for, but apparently Western Power (our DNO) are
exceptionally inflexible when it comes to the 16A/phase limit for
export.

Estimated output is between 3000 and 3100 kW per year, which I think
I'll be happy with.

James


------------------------------------

<*> Join the Automated Home Forums
http://www.automatedhome.co.uk/vbulletin/


UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.