The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024

Latest message you have seen: [OT] Blinkx


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Fw: Electronic deadbolts for doors



Jim Noble wrote:
> Gareth Cook wrote:
>> :-)
>>
>> We moved in a few months ago, and this rewire project wont be
>> (mostly) done before the end of the year. Comfort / CBus / CAT5
>> Flood Wire takes time !
>
> So what is it that's slow to do? Physically pulling the cables? The
> channelling? Wiring up?

Personally, I found that channelling took ages without power tools. 
Pulling
the cables to the ground floor took a weekend.  I've not pulled them from
the crawling space to their final locations yet.  Terminating takes even
longer though!  The sheer size of the task is the problem - all of it is
time consuming.  Time to pull some more cables.....

> Chances are all the plaster'll be coming off anyway, so channelling
> won't be a problem :-)

LOL.  That'll help.

Cheers,
Andy
--
http://www.andylaurence.co.uk
http://projects.andylaurence.co.uk




UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.