[Message Prev][Message
Next][Thread Prev][Thread Next][Message
Index][Thread Index]
Re: Fw: Electronic deadbolts for doors
Jim Noble wrote:
> Gareth Cook wrote:
>> :-)
>>
>> We moved in a few months ago, and this rewire project wont be
>> (mostly) done before the end of the year. Comfort / CBus / CAT5
>> Flood Wire takes time !
>
> So what is it that's slow to do? Physically pulling the cables? The
> channelling? Wiring up?
Personally, I found that channelling took ages without power tools.
Pulling
the cables to the ground floor took a weekend. I've not pulled them from
the crawling space to their final locations yet. Terminating takes even
longer though! The sheer size of the task is the problem - all of it is
time consuming. Time to pull some more cables.....
> Chances are all the plaster'll be coming off anyway, so channelling
> won't be a problem :-)
LOL. That'll help.
Cheers,
Andy
--
http://www.andylaurence.co.uk
http://projects.andylaurence.co.uk
UKHA_D Main Index |
UKHA_D Thread Index |
UKHA_D Home |
Archives Home
|