On 2/14/2021 8:39 AM, ABLE1 wrote:
> Hey Guys,
>
> Again it has been a while with a lack of post.
> So, i thought I would beat Jim to the PUNCH!!!
>
> Of course I don't know about everybody's work load
> but mine, so I will share a bit.
>
> For me, something happened about 5 or so weeks ago.
>
> All went from multiple service calls and small projects
> to Camera System Upgrade, Phone System Upgrade, New Camera
> System Install, Access Control Upgrade, another Camera System
> Upgrade, at least 3 cellular communication upgrades, continued
> Service Calls, along with a emergency call when some intelligent
> human decided to completely "water wash down" the inside of a empty
> 125,000 sq-ft warehouse. Which had a fire alarm system installed by me!!
> Â There were over 300 ground fault signals to the C/S (run away) until
> I could get there and power the system down. Waited 4 days for all to
> dry out!! Good now!! Fortunately the Fire Trucks were not dispatched!!
>
> Oh, and not all of the above projects are completed as yet. I found
> out a L-O-N-G time ago that I can O-N-L-Y be working on O-N-E project
> at a O-N-E specific location at time.
>
> Basically the others will have to wait till I get there!!
>
> My point with all of this is that, what/who opened the FLOOD gates??
>
> I know, I know, just dumb luck!!
>
> Regardless it has been most challenging.
>
> Hope all you guys are doing well and the Busy Fairy is being
> gentle on you!!! I plan on having a very specific detailed
> discussion with mine................... once I find him/her!!!
>
> Oh and Happy Valentines Day to all and your "others"
>
> Les
I have to put up two new jobs boards. A longer one just for custom work
(the old one is full), and a separate one for stock design cuts. I
painted lines and titles on them yesterday. (I also placed a new
milling machine yesterday.) Today they will get hung up in my office.
I currently have a single jobs board with custom work on one side and
stock cuts on the other. Its full and there are jobs not yet on the
board. I have to admit I miss the old 4x8 jobs board I had in my office
on Ave C. I also went with magnetic boards this time so I can just move
the marker to the next job on the board instead of having to rewrite it
periodically. I am at 14-16 weeks prepaid custom work right now.
--