[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]
How do I install a Napco GEM-C128 fire panel to work properly?
My staffers tried to install a GEM-C128 fire panel and never got round tot it.
They had programmed the SLC devices - 33 smokes(001 - 033) and 3 manual pull
stations(034 - 036). The NAC-A circuit has 4# 24VDC bells and the Area 1 has 2
FK1 keypads. We downloaded the panel and made corrections and then downloaded
back to the panel. First problem was that the keypad will never accept the
time set on the clock. The clock is always 1 hour and a few minutes behind,
even when daylight saving time is not checked. Consequently, the communication
will always notice that the clock is not set and should be set by the dealer.
Each time it is set, it goes back an hour and a few minutes. The second major
issue is that anytime we try to exit programming the system will first display
"Processing...." then go into 01 OUT OF SYSTEM. We always have to shut down
and start allover again. Lastly, the keypad is unable to discover any device
wired into the SLC circuit even after programming has been enabled
--
posted via
http://forums.cabling-design.com/security-physical/how-do-i-install-a-napco-gem-c128-fire-panel-to-work-properl-64845-.htm
using Cabling-Design's Web, RSS and Social Media Interface to
alt.security.alarms and other telecom groups
alt.security.alarms Main Index |
alt.security.alarms Thread Index |
alt.security.alarms Home |
Archives Home