[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

Re: Commercial Burg



"G. Morgan" <g.m@xxxxxxxxxx> wrote in message
news:c7qik69njhpj8rq8bg57ss5v13v21au03n@xxxxxxxxxx
> "ABLE1" <royboynospam@xxxxxxxxxxxxx> wrote:
>
>>That's already verified by the owner in a phone conversation with his
>>agent.
>>Installing company NOT required to be UL.  Only the equipment needs to be
>>as
>>well as the Central Station.
>>

I realize there is a lot to this and I am trying to fill in the blanks.

The customer want me to install the system and he says the Ins. Co. is ok
with me doing the project as long as the equipment is UL Commercial
Mercantile grade.

So far I understand that the Vista 128BPE with ULKT will serve as the panel.
Tamper on Panel Door and rear of cabinet.
Double EOLR's  or Commercial Bias Contacts
Less than 4 step catch Motion Detectors
Dedicated Breaker for circuit
Cell Back-Up
UL Bell???
Some kind of enclosure that contains the power transformer

Is there anything special with central station requirements such as 24 hour
test, Supervised Openings/Closings, or anything that would put this over the
top of normal??

I want to make sure I get this as right as possible. I am still getting
pricing and I may get priced out of the project.

Thanks again.

Les





alt.security.alarms Main Index | alt.security.alarms Thread Index | alt.security.alarms Home | Archives Home