[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]
Re: N S E W (a little long)
IDIOTS...but you did what I woulda done...hasta la bye bye...BBQ sammich
time- CyA!
--
**Crash Gordon**
"ABLE_1" <royboynospam@xxxxxxxxxxxxx> wrote in message
news:5YqdnUvhir016_nanZ2dnUVZ_h2pnZ2d@xxxxxxxxxxxxxx
| Since we seem to be sharing experiences lately here is another one of
mine.
|
| Took a sub-contract job yesterday to a local chain store. Before I went I
| checked on line to see what kind of store it was. It seems that this
store
| just opened last week. So I called back to guy that is sending me out to
| troubleshoot some problems with a couple of doors.
|
| He said yes it is a new store. I said why not have the installer fix the
| problems??? He says that the guy is now on vacation. Sooooooo Ok I will
go
| and take care of the problem. Or so I thought.
|
| Arrived on site and asked for the manager. Manager takes me to the back
of
| the store to the keypad at the delivery door. The system is a Vista 20
with
| 32 hardwired zones by the way. The keypad is beeping and a zone is
showing
| up "Check". Manager says how do you stop that from beeping. I say well
the
| "problem" with the door has to be fixed for it to stop. So I look at the
| zone list which says zone 32 is the SW Emergency Exit Door. I say we are
at
| the SW of the building. She says we have figured out that this door is
Zone
| 1 and it is marked NE Emergency Exit.
|
| I start look at the zone list and nothing makes any sense. Then I opened
| the panel and found a full D-Size drawing of the building and it had Zone
| Number marked on it for each door. So I figured that there must be a bad
| door contact on the NE Emergency Exit Door. I go check and found that the
| installer used One-Way Security Screws. I can't even jump out the door
| contact to verify the problem without drilling out the screws.
| Geeeezzzzzzzz!!!!
|
| That is when I called the Alarm Company. After I explained the BIG issue
| with the definitions on the zone list. The project manager said well if
you
| hold that plan with the ledger at the bottom North is at the top and South
| is at the bottom. You should be able to locate the zones from that. Are
| you freaking nuts????????????????
|
| You have this customer of yours rather upset with their NEW alarm panel
| because they can't figure out what door is what. This is going to take
some
| time to fix.
|
| Long story (sorry) now shortened. They decided that I was going to charge
| them too much and wanted me to leave and they will have the original
| installer go there when he gets back from vacation and fix the problems.
|
| OK so I'm outta
| here..................................................................
|
| Oh and the Check issue is because they programmed the doors for Trouble
Day
| and Alarm Night. They were reluctant to change the program.
|
| Now all they have to do is pay my Invoice when it arrives.
|
| Later all,
|
| Les
|
|
alt.security.alarms Main Index |
alt.security.alarms Thread Index |
alt.security.alarms Home |
Archives Home