The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Message Prev][Message Next][Thread Prev][Thread Next][Message Index][Thread Index]

RE: Introductory Message


  • Subject: RE: Introductory Message
  • From: "Rob Mouser" <groups@xxxxxxxxxxxx>
  • Date: Sat, 22 Oct 2005 14:33:26 +0100

> C-Bus is one of those things that I've installed for clients but never
> been 100% happy with. With my "lighting designer" hat on,
there are a
> few rough edges around the way that there scene model works - not an
> issue unless you regularly have a dozen or more lights in a scene,
with
> some scenes controlling different sets of lights, and some lights
> included in some scenes but not others.

Hmmmm, a dozen or more sets in one scene? Unless Martin is building a
mansion or hotel I'm not convinced that's a real issue for the
"average"
user. If you really need greater control over scenes then simply add a
Pascal Automation Controller (PAC) http://tinyurl.com/bk5aj

For my 2p's worth Cbus just works. Installed here for 3 years without a
hitch. Simple to install and easy to configure. It also a good deal more
flexible than a 2 gang switch :-)

> The other thing about Flexidim is that I do have a bit of a patriotic
> streak in me, and do like the idea of supporting British
> manufacturers :-)

Still driving a Bentley Mark? Ah yes that bastion of erm German
engineering!
;-)

Sorry /me is feeling mischievous!

Rob




UKHA_D Main Index | UKHA_D Thread Index | UKHA_D Home | Archives Home

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.