The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024

Latest message you have seen: RE: Re: Since my UPS died...


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: EIB installation


  • To: <ukha_d@xxxxxxx>
  • Subject: RE: EIB installation
  • From: "Hawes,Timothy Edward (GEG)" <haweste@xxxxxxx>
  • Date: Fri, 16 Jan 2004 12:57:22 -0000
  • Mailing-list: list ukha_d@yahoogroups.com; contact ukha_d-owner@xxxxxxx
  • Reply-to: ukha_d@xxxxxxx

> -----Original Message-----
> From: Martin Wonders Sent: 16 January 2004 09:16
>
> I'm starting a new build in April and SWMBO (who is an
> Electrical Engineer
> and will not be blinded by science) wants the the power wiring
> to be standard (thinking about resale).
>
> Martin CW

Martin,

Just before I dive in with some comments, what exactly do you mean when you
talk about "standard" wiring. If you wire for A.N.Other hardwired
system; CBus, Polaron etc. you can revert to standard switches &
sockets by removing your intelligent, centrally-located kit and replacing
with connecting blocks (for want of a better description).

Or, if it's really a problem, run two lots of mains cables (e.g. CBus and
'standard' configurations) and only connect up the second lot when you come
to sell.

Cheers,

Tim.

+

UK Home Automation Meet 2004 - BOOK NOW!
http://www.ukha2004.com

http://www.automatedhome.co.uk
Post message: ukha_d@yahoogroups.com
Subscribe:  ukha_d-subscribe@yahoogroups.com
Unsubscribe:  ukha_d-unsubscribe@yahoogroups.com
List owner:  ukha_d-owner@yahoogroups.com


Home | Main Index | Thread Index

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.