The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Foundations are in!


  • To: ukha_d@xxxxxxx
  • Subject: Re: Foundations are in!
  • From: "Dr John Tankard" <john@xxxxxxx>
  • Date: Thu, 31 May 2001 21:30:45 -0000
  • Delivered-to: rich@xxxxxxx
  • Delivered-to: mailing list ukha_d@xxxxxxx
  • Mailing-list: list ukha_d@xxxxxxx; contact ukha_d-owner@xxxxxxx
  • Reply-to: ukha_d@xxxxxxx

--- In ukha_d@y..., steve_almond@b... wrote:
> I'm new to this, so please excuse any "yet another"
questions - I
> have trawled the archives though. I have also gathered some
> background from various other websites.
>
> We are having a new house built, it will be our last move, and the
> foundations are now in. We hope to move in by end October
(hopefully
> THIS year).
>
> We are keen to incorporate a sensible amount of 'Home Automation'.

First, i hope you enjoy this group.

Several on this list have started from scratch, as you are dooing.

You will get losts of advice here, my advice is :-

1) put loads of cat 5 in
2) put more cat 5 in
3) just fo good measure add more cat5.

You may think this is a joke, it is not I have put loads in and it is
not enough.

4) run one cat5 through every room in a bus form for DS 1 wire temp
sensors.

5) Get comfort.

6) Get homevision

7) Home run every light fitting to a consumer unit.

8) dedicated wall skts for lights should be Kliks or other non
standard skts

9)Run home run cat5 from every light switch to node 0

10) run 5a t&e from every light sw to node 0 just incase you sell up.

11) get a pronto.

12) If you are going to have a office with a pc on all the time make
sure the room is sound tight.

13) Fit moterised valves on the CH if you are using rads for each
zone and run back to node 0.

14) If your site is exposed and you dont want to do 13 get a good
heating controler with compensation, and PID. By that i mean a
proportional valve control not just a moterised valve.

15) put more 13a skts in

16) put more cat 5 in

17) read this lists archives

18) get some ddar'e

19) put some more cat5 in

20) run cat 5 to each main outside door

21) run screened cable for each door station, and keypads for comfort.

22) Tag every cablel

23) keep cat 5 clear of mains, cross at 90o and try to keep at more
than 18" away if it has to run parrellel

24) for downfeeds use min Ct100 or Ct125 coax

25) put some more cat 5 in.

Sorry for the bad spelling. working on a epod...


Very best of luck on your new build.

This link might be of use on the building side:-

http://www.tankard.com/links.htm

John






Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/




Home | Main Index | Thread Index

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.