The UK Home Automation Archive

Archive Home
Group Home
Search Archive


Advanced Search

The UKHA-ARCHIVE IS CEASING OPERATIONS 31 DEC 2024

Latest message you have seen: Re: House wiring - follow up


[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Floorboards



Get a nail the same size as the ones in the boards, cut off the point and
use it as a punch to drive the nails through before lifting the board,
don't
knock them right through or you will not have a head to pull them out with
once the board is up.
If the boards are tongue and grooved use a bolster to split the tongue
first.

Alancc
----- Original Message -----
From: Graham Butler <graham@xxxxxxx>
To: UKHA_D <ukha_d@xxxxxxx>
Sent: Sunday, December 23, 2001 11:31 PM
Subject: [ukha_d] Floorboards


> Anyone got any tips on how to get these up in one piece?  They tend to
be
> nailed to at least 3 or more joists, ie one in the middle as well as
the
> ends, and it's proving rather a pain getting them up. There was a
half-sized
> board not nailed, for access to some existing cabling, which has
provided
me
> with a starting point, but it's still a real pain.
>
> G
>
>
>
> For more information: http://www.automatedhome.co.uk
> Post message: ukha_d@xxxxxxx
> Subscribe:  ukha_d-subscribe@xxxxxxx
> Unsubscribe:  ukha_d-unsubscribe@xxxxxxx
> List owner:  ukha_d-owner@xxxxxxx
>
> Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/
>
>
>



  • References:
Home | Main Index | Thread Index

Comments to the Webmaster are always welcomed, please use this contact form . Note that as this site is a mailing list archive, the Webmaster has no control over the contents of the messages. Comments about message content should be directed to the relevant mailing list.