----- Original Message -----
Sent: Tuesday, December 04, 2001 10:02
AM
Subject: RE: [ukha_d] The Gatwick
Cabling
Party - write up
Used a 20mm holesaw to cut through the ceiling
plasterboard and the metal
'stud' at the top of the wall. Can
easily
pass 4 CAT5 cables down. There
was a noggin (metal) between the
uprights which had quite handy perforations
in it at regular
intervals. Had the internal walls been of wooden stud
construction
then things would have been MUCH more difficult - we ran 4
CAT5s from
node
zero to the backbox in the wall in around 10-15 mins towards
the
end.